48,307
edits
m (new known issue (#32360)) |
|||
Line 5: | Line 5: | ||
{|style="margin: auto; margin-bottom:1em; width:100%; border:0px solid grey;" | {|style="margin: auto; margin-bottom:1em; width:100%; border:0px solid grey;" | ||
| rowspan="2" style="padding:0px 10px 0px;" | [[File:icon_archived_docs.png|45px|link=]] | | rowspan="2" style="padding:0px 10px 0px;" | [[File:icon_archived_docs.png|45px|link=]] | ||
| style="padding:0px 40px 0px 10px; color: grey; font-size: 70%; text-align:left;" |May | | style="padding:0px 40px 0px 10px; color: grey; font-size: 70%; text-align:left;" |May 25, 2023 <br />Installation is highly recommended as it includes various performance, stability, and other key customer fixes. For details, see [[Change report 5.1.0 Apollon]]. | ||
|}</div> | |}</div> | ||
Line 131: | Line 131: | ||
== {{anchor|fixes_v11}}Fixes: SEP sesam Server 5.1.0 Apollon == | == {{anchor|fixes_v11}}Fixes: SEP sesam Server 5.1.0 Apollon == | ||
{{Box Hint|Fixed with [http://download.sep.de/ 5.1.0. | {{Box Hint|Fixed with [http://download.sep.de/ 5.1.0.5 ''Apollon'']| | ||
;SEP sesam since v. 5.1.0.2 - Hyper-V RCT INCR may run with wrong reference if previous Hyper-V backup failed or was aborted | |||
::Hyper-V may exhibit a backup issue where the timestamp for RCT backups may be set incorrectly if backup failed or was aborted, which can lead to an invalid backup chain. In such cases the subsequent INCR backups may reference the failed backup instead of the last successful backup. | |||
:::'''Workaround:''' Start a FULL backup in case a FULL or INCR backup did not finish sucessfully. This will ensure that the backup timestamp is correctly set, preventing any further issues in the backup chain. It is also recommended to regularly test the validity of backups and monitor backup logs for any errors or anomalies. | |||
:::'''Resolution:''' Fixed with '''5.1.0.5'''. | |||
* Hyper-V restore and Hyper-V Mount and SFR restore | * Hyper-V restore and Hyper-V Mount and SFR restore | ||
* Restore of a sparse file bigger than 4GB gets stuck but destination file becomes larger and larger | * Restore of a sparse file bigger than 4GB gets stuck but destination file becomes larger and larger | ||
Line 148: | Line 153: | ||
----- | ----- | ||
==={{anchor|major}}Severity: MAJOR=== | ==={{anchor|major}}Severity: MAJOR=== | ||
----- | ----- | ||
Line 157: | Line 160: | ||
::The functions of the two options for handling running events during NEWDAY have been inadvertently swapped, causing them to perform the opposite of their expected behavior. These two options can be found in Newday event Properties window, accessed from ''Main Selection -> Scheduling -> Schedules'' by double-clicking the Newday event (for more information see [[Special:MyLanguage/5_1_0:Newday_Event|Newday Event]]). | ::The functions of the two options for handling running events during NEWDAY have been inadvertently swapped, causing them to perform the opposite of their expected behavior. These two options can be found in Newday event Properties window, accessed from ''Main Selection -> Scheduling -> Schedules'' by double-clicking the Newday event (for more information see [[Special:MyLanguage/5_1_0:Newday_Event|Newday Event]]). | ||
:::'''Workaround:''' To achieve the desired behavior, select the opposite option of your intended action. For instance, if you want Newday to continue all running activities, select the option '''Cancel all running activities''' (and vice versa). | :::'''Workaround:''' To achieve the desired behavior, select the opposite option of your intended action. For instance, if you want Newday to continue all running activities, select the option '''Cancel all running activities''' (and vice versa). | ||
:::'''Resolution:''' SEP is working on this issue and will provide a fix as soon as possible. | |||
;SEP sesam v. 5.1.0.5 - (#32360) On the German GUI Client the default setting for deleting savesets after migration is set to ON | |||
::When creating a new migration task in German language version of the GUI, the option '''Nach erfolgreicher Migration löschen''' is by default set to '''An (Mit nächstem 'Bereinigen' löschen)'''. This option can be found in Migration Task window, accessed from ''Main Selection -> Tasks -> Migration Tasks'' by clicking ''New Migration Task'' (for more information see [[Special:MyLanguage/Creating_a_Migration_Task|Creating a Migration Task]]). Note that in the English version, this option is set to ''Off''. | |||
:::'''Workaround:''' When creating a new migration task, review and modify the setting for this option as required. | |||
:::'''Resolution:''' SEP is working on this issue and will provide a fix as soon as possible. | :::'''Resolution:''' SEP is working on this issue and will provide a fix as soon as possible. | ||