4 4 3 Beefalo:Backup Plans

From SEPsesam
<<<Back
Tasks by Groups
User Manual
Next>>>
Migration Tasks

Backup plans

The Backup Plans (Main Selection -> Tasks -> Backup Plans) provides an overview of all configured tasks, task groups, migrations, and replications assigned to a schedule. By default, the displayed backup plans also include unscheduled tasks. To prevent unscheduled tasks from being displayed, use the Hide Unscheduled Tasks option.
With SEP sesam v. 5.0.0 Jaglion, the option Hide Unscheduled Tasks has been replaced with quick filtering. With the new Quick Filter, you can show/hide unscheduled tasks and filter the results by type (backup, backup group, etc.) and/or level (Copy, Full, etc.).


  • Properties: Shows information about the selected object, e.g., task, task group, migration, or replication.
  • New Backup Event: By selecting a backup task or a task group and clicking New Backup Event, you can configure a new backup event, as described in Creating a Backup Event.

See also

Tasks by ClientsTasks by GroupsMigration TasksReplication TasksCreating a Backup Event


Copyright © SEP AG 1999-2024. All rights reserved.

Any form of reproduction of the contents or parts of this manual is allowed only with the express written permission from SEP AG. When compiling and designing user documentation SEP AG uses great diligence and attempts to deliver accurate and correct information. However, SEP AG cannot issue a guarantee for the contents of this manual.